Contact Us

Planning Drawings for a Permitted Development Outbuilding or Detached Garage Planning Application for a fixed fee - we will visit your site, produce accurate planning drawings for your extension.


Permitted Development Outbuilding/Detached Garage Planning and Building Regulations Package - FIXED FEE OF JUST £895.00

If you are planning to build an Outbuilding or Detached Garage under your permitted development rights we can provide an excellent value FIXED FEE Planning and Building Regulations Package. Our package is available for Permitted Development Outbuiding and detached garage proposals.

Included In Our FIXED PRICE:




Outbuilding/Detached Garage

Building Regulations Package  

FREE UPGRADE

Permitted Development Outbuilding Planning Drawings £895.00

For a fixed fee of just £895.00 we will provide a complete set of Planning Drawings for a Permitted Outbuilding or Detached Garage.


Our Planning Drawings are suitable for the purposes of obtaining a Certificate of Lawful Development for Permitted Development projects.


Stage 1 - The site survey:


For our fixed fee we will visit you at your property to discuss your requirements and will also measure your property. We do not usually require up front payment for our services and there will be no fees to pay on the day of the survey.


Stage 2 - Production of As Existing Drawings and Collection of Fees:


In the days following our survey we will create your As Existing Floor Plans and Elevations drawings. When these drawings are ready (usually within 5 working days) we will send them to you by email for review, at this point we issue your invoice for the Planning Drawings Fees (£895.00) to be paid within the following 7 days.


Stage 3 - Development of the Proposed Layouts


Once we are in receipt of your fees we will quickly move on to develop your As Proposed Floor Plans and Elevations. The first Draft copies of the plans should usually be emailed to you within 3 working days of receipt of your fees. The Draft drawings will be based on the discussions we will have during our site visit and will be a good starting point from which your scheme will be developed to suit your requirements.


The scheme will be modified as many times as necessary in order to progress your project to its final layout. We will offer advice and ideas for your scheme but the final layouts will be tuned to your preferences.


Stage 4 - Submission to Planning


When you agree that the development of your scheme is complete we will submit your planning drawings for a lawful development certificate (if required) and act as your planning agent - any fees for planning permission shall be payable directly to your local planning department and are not included in our fixed fee.


We will deal directly with your planners and work to get your planning permission in place. If the planners require minor alterations or tweaks to the scheme, we will make changes without fee. If the planners require substantial alterations to a scheme we will let you know and discuss ways to progress, there may additional fees for the extra work but these will be reasonable and confirmed with you in writing before proceeding.


Stage 5 - Completion of the Planning Phase of your project:


Once your Planning Permission is agreed, or your permitted development scheme is agreed as being to your satisfaction, we will be ready to progress to the production of your Building Regulations Package. Not every customer requires Building Regulations Drawings, but if you do we will proceed to upgrade the Planning Drawings to a technical Building Regulations Package which can be used by your builders to provide a detailed quotation and your local Building Control to check your plans are compliant.



CLICK HERE to find out about a great value fixed fee Building Regulations Package





Outbuilding/Detached Garage

Planning Drawings Package  

FIXED at JUST £895.00

Included In Our FIXED PRICE:




Permitted Development Building Regulations Outbuilding